Site icon Model-Based Design

Model-Based Design Adoption Time Line

This post starts a section looking at the timing and requirements of each phase of establishing a Model-Based Design culture.   With that in mind, the timeline for adopting an MBD process and establishing an MBD culture is dependent on multiple factors including, but not limited to

There are 5 phases of adoption and a 6 ongoing optimization phase.  The adoption and establishment can take between 3 to 5 years depending on scope as outlined above

  1. Exploration phase: 1 ~ 3 month
  2. Initial adoption: 3 ~ 6 months
  3. Validation project: 6 ~ 9 months
  4. Group roll out: 12 ~ 18 months
  5. Department roll out: 15 ~ 24 months
  6. Optimization: ….

In future posts, we will look at these phases in detail.

Exit mobile version